Chains stays are in so it time to hand mitre the seat stays.
Then is time to fit them and one last check with the dummy wheel. We then pop the dummy wheel out and drop a dummy axle which is a normal axle set to a 132mm so that it will come back to 130mm when it done.
flux and braze in both ends:
before i clean it up it best to check the dropouts with a tool:
you can add filler at the Bottom bracket to move the stays but since this is very close a qucik cold set. pullign on the handles to set it straight.
Perfect. loads of cleaning up to do then the brake bridge and brazons.
Leave a Reply